Skip Navigation
Welcome to Carlisle, MA
Photo of Carlisle
Photo of Carlisle
Photo of Carlisle
Photo of Carlisle
This table is used for column layout.

 
Zoning Board of Appeals Exhibits
Spacer
Lifetime Green Homes, LLC - Long Ridge Road
 
Brem_001_07.03.2014     Lifetime Green Homes Application
Brem_002                        Applicant’s Stormwater Management report Vol. 1  - See Brem 003
Brem_003_07.03.2014     Applicant’s Stormwater Management report Vol. 1 revised  (5.2 mb)
Brem_004_07.03.2014     Applicant’s Stormwater Mangement report Volume 2 (11 mb)
Brem_005_07.03.2014     Site plan – full size map n.a. electronically, see 8½” x 11” in Brem_001
Brem_006_07.03.2014     Utility plan – full size map n.a. electronically, see 8½” x 11” in Brem_001
Brem_007_07.22.2014     Letter from Hill Law – abutters comments
Brem_008_07.18.2014     Letter from Carlisle BOH regarding well classification
Brem_009_07.03.2013     Applicant’s Requested Waivers

Brem_010_07.26.2014     Letter of comments from Carlisle Fire Department
Brem_011_07.28.2014     Purchase & Sale Agreement of 100 Long Ridge Rd to Lifetime Green Homes
Brem_012_07.06.2014     Proposed Scope of Services for traffic study by MDM Transport
Brem_013_07.28.2014     Lifetime Green Homes Commonwealth of Mass Annual Report
Brem_014_08.07.2014     Letter from BOH requesting written determination regarding wells
Brem_015_07.29.2014     Ltr. from applicant to BOH regarding DEP Annual Report – Water Supply
Brem_016_07.29.2014     Ch. 40B Technical Review Assistance Application
Brem_017_08.08.2014     Nobis Engineering proposal for professional services (4.1 mbs)
Brem_018_08.07.2014     Nitsch Engineering proposal for civil and traffic peer review
Brem_019_08.06.2014     Horsely Witten Group proposal for Environmental Consulting Services

Brem_020_08.08.2014     Beals & Thomas response to request to provide consulting svcs. (14 mb)
Brem_021_08.15.2014     Grading plan – full size map – not available electronically
Brem_022_08.20.2014     Deschenes & Farrell, P.C. letter requesting permission to survey wells
Brem_023_08.20.2014     Memo of comments from Planning Board to ZBA
Brem_024_09.03.2014     Email from applicant regarding list of documents from 8/27/14 meeting
Brem_025_09.03.2014     Email from Member Galligan – list of incomplete areas on application
Brem_026_08.26.2014     Applicant's NOI as delivered to Conservation Comm on paper (8 mb)
Brem_027 - Brem_049     not used

Brem_050_08.14.2014     Horsley Witten Group revised proposal for consulting services
Brem_051_08.14.2014     Horsley Witten Group professional experience of Neal M. Price
Brem_052_08.14.2014     Horsley Witten Group Conventry Woods report
Brem_053_08.13.2014     Nitsch Engineering revised proposal for civil engineering services
Brem_054_08.29.2014     Email from Nitsch Eng re: Proposal Update for 40B
Brem_055_09.03.2014     Copy of check from applicant for $18,000 for peer review costs
Brem 056                                not used
Brem_057_09.05.2014     Architectural Plans at scale of ¼” = 1’ – 0”
Brem_058_09.10.2014     MDM Transportation report with comments from Nitsch Eng
Brem_059_09.11.2014     MHJ Associates memorandum re: Missing Documents

Brem_060_09.12.2014     Applicant’s letter to ZBA re: water supply – wells & hydrogeologic study  
Brem_061_09.15.2014     MDM Transportation report with comments from Nitsch Eng
Brem_062_09.15.2014     Email to ZBA from abutter Dave Ringheiser
Brem_063_09.15.2014     Ltr. from applicant to ConsCom, Cc:ZBA rgd 3rd reviewer at site inspection
Brem_064_09.15.2014     Letter from Hill Law - list of abutters representing
Brem_065_09.22.2014     Letter from applicant to MassHousing – update on project
Brem_066_09.24.2014     Letter from ZBA to applicant requesting delinquent information
Brem_067_09.26.2014     Letter from applicant to ZBA regarding traffic study
Brem_068_09.26.2014     Plan of Existing Conditions of wells & septic within 200 feet of property
Brem_069_09.26.2014     Ltr. from applicant’s atny. addressing missing document & revised waivers

Brem_070_10.01.2014     BOH rsp. to ZBA request for comments on water supply & septic system  
Brem_071_10.03.2014     Hill Law memo to BOH regarding Public Water System Determination
Brem_072_10.02.2014     Assessor’s letter to abutter missed in initial notification
Brem_073_10.02.2014     BOH letter to ZBA regarding proposed well testing protocol
Brem_074_10.02.2014     ConsCom Ltr to ZBA re Wetlands Hearing and Wetlands Peer Review Status
Brem_075_10.01.2014     BOH ltr to ZBA: Water Supply - Wells Testing Protocol
Brem_076_10.03.2014     HILL Law Memo to ZBA  re Horsley Witten Grp Hydrolgy Study
Brem_077_10.06.2014     Letter frm Lyn Lemaire to ZBA regarding 40B Concerns
Brem_078_10.06.2014     See BREM 095
Brem_079_09.15.2014     NGI scope of work report to applicant Re: ground water (table missing).

Brem_080_10.14.2014     NGI Scope of Work Report to Applicant Re: Ground Water (table included)
Brem_081_10.17.2014     Ltr from Horsley Witten Group to ZBA regarding Goundwater Analysis
Brem_082_10.21.2014     GeoHydroCycle, Inc. representing abutters recommendations
Brem_083_10.21.2014     Board of Health Scope of Work Recommendations to ZBA
Brem_084_10.21.2014     Proposed Condominium Provisions Relative to Water Lines and Wells
Brem_085_10.24.2014     Traffic Assessment by MDM Transportation Consultants, Inc (8mb)
Brem_086_10.24.2014     Landscape Plan prepared by Garnder + Gerrish, LLC (2 pages)
Brem_087_10.24.2014     Nitsch Engineering Peer Review Initial Report – Preliminary
Brem_088_10.27.2014     Nitsch Engineering Peer Review Initial Report – Final
Brem_089_10.23.2014     Board of Health Additional Scope of Work Recommendations

Brem_090_10.30.2014     Proforma documents from applicant
Brem_091_10.30.2014     Letter of concern to ZBA from Susan Blankenship, a Carlisle resident
Brem_092_10.31.2014     See BREM 094
Brem_093_10.31.2014     Letter from Applicant to BOA re: septic system
Brem_094_11-03-2014     Updated Traffic Memo from NITSCH Eng., Replaces BREM 092
Brem_095_11-03-2014     Updated Architectural Board Replaces BREM 078
Brem_096_11-03-2014     Locus Map with Plan Inserted & Neighborhood Tree Cover
Brem_097_11-07-2014     Project location overlay on satellite view
Brem_098_11-03-2014     Rear Perspective of Building Type A
Brem 099 11-03-2014          Project Building Specifications

Brem_100_11-03-2014     Architectural Facsimile - Building Type B
Brem_101_11-06-2014     Agreement to extend time to conduct public hearing
Brem_102_11-07-2014     Ltr from Applicant to Cons Comm in resp to EcoTec, Inc review
Brem_103_11-07-2014     Review of Notice of Intent form Eco Tec, Inc. to Cons Comm
Brem_104_11-10-2014     Ltr of recommendations to Building Inspector from the Fire Dept
Brem_105_11-13-2014     Neighborhood Well and Septic Exhibit
Brem_106_11-13-2014     Neighborhood Flow Path Exhibit
Brem_107_11-14-2014     GeoHydroCycle, Inc ltr. to Nitsch Engineering re: testing recommendations
Brem_108_11-14-2014     Applicant's letter to BOA
Brem_109_11-14-2014     Ltr to Mass DEP re: groundwater resources from Carlisle Town Counsel

Brem_110_11-17-2014     Letter to BOS from Thornton Ash, re: water testing
Brem_111_11-17-2014     Letter to BOS from Steven Davis, re: water testing
Brem_112_11-17-2014     Letter to BOS from Carolyn and Colin Higgins, re: water testing
Brem_113_11-17-2014     Well Impact Testing Options Submitted B
Brem_114_11-17-2014     Private Well Guidelines Pgs 15 and 16
Brem_115_11-17-2014     Rendering of Water Flow Submitted by SC
Brem_116_11-17-2014     Richard Williams, PHD, Regard
Brem   117 11-24-2014   Letter of concern to the ZBA from Dave Ringheiser, an abutter
Brem_118 11-24-2014     Letter of concern to the ZBA from Thornton Ash, an abutter
Brem_119 12-01-2014     Letter of concern to BOS from Long Ridge Road Neighbors

Brem_120 12-01-2014       Letter from BOH regarding meeting with MassDep on water supply
Brem_121 12-04-2014       Letter of clarification to BOS rom Thornton Ash, an abutter
Brem_122 12-08-2014       Response ltr. by applicant to peer review, Fire & Police Dpts & others
Brem_123 12-08-2014       Residential Site Plan – cover sheet
Brem_124 12-08-2014       Residential Site Plan – detail
Brem_125 12-08-2014       Residential Site Plan – existing conditions
Brem_126 12-08-2014       Residential Site Plan – layout/dimension plan
Brem_127 12-08-2014       Residential Site Plan – detailed grading & utility plan
Brem_128 12-08-2014       Residential Site Plan – Plan & Profile and Utility plan – Phase 1
Brem_129 12-08-2014       Residential Site Plan – Plan & Profile and Utility plan – Phase 2

Brem_130 12-08-2014     Stormwater Management Design – Signed and Stamped
Brem_131 12-08-2014     Stormwater Management Design – Volume 1 of 2 (11.8 MB)
Brem_132 12-08-2014     Stormwater Management Design – Volume 2 of 2
Brem_133 12-08-2014     Pressure Sewer Prelim Cost & Design Analysis by Environment One Corp
Brem_134 12-08-2014     E/ONE Pressure System Design Report
Brem_135 Not used
Brem_136 12-12-2014     Landscape plan by Gardner + Gerrish, LLC
Brem_137 12-12-2014     Plant schedule by Gardner + Gerrish, LLC
Brem_138 12-22-2014     Nitsch Eng. Revised Peer Review Report
Brem_139 12-24-2014     GeoHydroCycle, Inc. recommendations regarding groundwater testing  

Brem_140 12-31-2014     Applicant's amendments to requested local waivers
Brem_141 12-31-2014     Applicant's attorney letter to ZBA regarding waivers
Brem_142 01-02-2015     Correspondence from Hill Law to ZBA rgd revised design of the project
Brem_143 01-05-2015     Board of Health memorandum to ZBA regarding waivers
Brem_144 01-05-2015     Mass DEP Clarification of Groundwater Mounding Analysis & Pressure Distrib
Brem_145 01-05-2015     Applicant's Computation of Sewage Flows
Brem_146 01-08-2015     Soil Testing Brem-2012,2014
Brem_147 01-08-2015     Soil Testing Berkes - 1998
Brem_148 01-09-2015     Applicant's Attorney's ltr. to ZBA regarding Hydro testing and extension
Brem_149 01-12-2015     Letter of concern to Mass DEP from Thornton Ash, an abutter

Brem_150 01-13-2015     Letter of concern to Mass DEP from Lyn Lemaire, a resident
Brem_151 01-14-2015     Proposed Scope of Services from Nobis engineer Jim Vernon
Brem_152 01-14-2015     Comments and Recomendations from GeoHydroCycle, Inc., Steve Smith
Brem_153 01-16-2015     Comments on Revised Plans from Carlisle Planning Board
Brem_154 01-20-2015     Applicant's letter of approval for Nobis Engineering to inspect the property
Brem_155 01-22-2015     BOH comments on water supply classification
Brem_156 01-22-2015     Fire Dept. comments on Nitsch Peer Review Report
Brem_157 01-23-2015     Town Advisory Group input to the ZBA on the process
Brem_158 01-26-2015     CCC response to ZBA request for comment
Brem_159 01-28-2015     Letter from Lyn Lemaire, a resident, to BOS requesting bylaw enforcement

Brem_160 02-02-2015     Letter to ZBA from the Applicant providing an update
Brem_161 02-03-2015     MDM Transportation Response to Peer Review Comments
Brem_162 02-03-2015     MDM Transportation Revised Traffic Study 166p.
Brem_163 02-06-2015     Extension of hearing process agreement
Brem_164 02.06.2015      Applicant’s response to comments from Nitsch Eng letter of 12/22/14
Brem_165 02-06-2015     Stormwater Management Report – Volume 1 of 2
Brem_166 02-06-2015     Stormwater Management Report – Volume 2 of 2
Brem_167 02-06-2015     Revised Residential Site Plan Set (19mb)
Brem_168 02-18-2015     BOH letter to ZBA regarding Grinder Pumps in Chelmsford
Brem_169 02-11-2015     ConsCom forwarding req/ from Applicant to continue ConsCom hearing

Brem_170 02-18-2015      Nitsch Engineering Drainage Review based Applicant’s revised repor
Brem_171 02-19-2015      BOH letter to ZBA regarding Title 5
Brem_172 02-20-2015     Nobis Engineering Independent Hydrogeologic Study – Phase 1 Report
Brem_173 02-23-2015     List of open issues prepared by ZBA member Martin Galligan
Brem_174 02-23-2015     Town Counsel req. for Peer Review Fees and Hydorgeologic Information
Brem_175 02-23-2015     Request from Applicant’s Attorney for continuance of hearing
Brem_176 02-23.2015     Applicant’s Attorney correspondence to Town Counsel
Brem_177 02-26-2015     Stormwater Management Report Volume 1 of 2
Brem_178 02-26-2015     Stormwater Management Report Volume 2 of 2 (7.2 mb)
Brem_179 02-26-2015     Bioretention Planting schedule

Brem_180 02-26 2015     Plan & Profile and Utility Plan – Phase 1
Brem_181 02-26-2015     Detailed Grading and Utility Plan
Brem_182 02-26-2015     Plan & Profile and Utility Plan – Phase 2
Brem_183 02-23-2015     Letter of concern to the BOS form Lyn Lemaire, a Carlisle resident
Brem_184 03-03-2015     Applicants ltr. to Peer Reviewer abt. HydroCAD & minor plan revisions
Brem_185 03-04-2015     ConsCom request to Applicant for WPA fees
Brem_186 03-05-2015     Letter of concern to the BOS from Lyn Leamire, a Carlisle resident
Brem_187 03-13-2015     Town Counsel req. to Applcant to provide hydrogeologic information
Brem_188 03-13-2015     Plan of monitoring well locations (1.3mb)
Brem_189 03-13-2015     Nitsch Engineering latest drainage review

Brem_190 03-13-2015     Town Counsel ltr. to Applicant - Outstanding Issues for 3/26/15 Hearing
Brem_191 03-16-2015     Applicant's rsp. to ZBA list of variations from standard practice
Brem_192 03-25-2015     Letter from Applicant's Attorney regarding survey data
Brem_193 03-25-2015     Northeast Geoscience Inc. Goundwater Impact Analysis
Brem_194 03-26-2015     Ltr. from Applicant presented at 3/26/15 meeting
Brem_195 03-26-2015     Ltr. from Applicant's Attorney presented at 3/26/15 meeting (6.7mb)
Brem_196 03-31-2015     Civil Eng response to Nitsch letter of 3/13/15
Brem_197 03-31-2015     Revised Construction Plans (22.2mb)
Brem_198 04-02-2015     Nitsch Engineering Traffic Memorandum
Brem  199 04-02-2015     Hearing Extension Agreement from Applicant's Attorney

Brem 200 04-03-2015     Town Advisory Group Report
Brem 201 04-06-2015     Applicant's list of changes to Construction Site Plan
Brem 202 04-10-2015     Horsley Witten Group comments on NGI report
Brem 203 04-15-2015     Letter of concern regarding potiental hydro impacts from Kenneth Belitz, Carlisle resident
Brem 204 04-17-2015    Letter of concern from group of abutters
Brem 205 04-15-2015    Letter from Thornton Ash, an abutter
Brem 206 04-17-2015    Nitsch Engineering updated comments and recommendations
Brem 207 04-17-2015    GeoHydroCycle,Inc review of NGI Groundwater Impact Analysis Rpt.
Brem 208 04-22-2015    Landscape Sign Feature profile view
Brem 209 04-22-2015    Photograph of rock to be used as sign (2mb)

Brem 210 04-23-2015    Fire Cistern requirements for recent residential developments
Brem 211 04-24-2015    Town Counsel ltr to DEP regarding Water Supply designation (11mb)
Brem 212 05-01-2015    Nobis Engineering Phase 2 Report (5.4mb)
Brem 213 05-04-2015    Northeast Geoscience Inc resp. to GeoHydroCycle ltr. of 4/17/15
Brem 214 05-04-2015    Horsley Witten Group Inc Nitrogen Loading Analysis
Brem 215 05-01-2015    Landscape sign - exhibit G
Brem 216 05-01-2015    Landscape sign - exhibit H
Brem 217 05-01-2015    Landscape sign - exhibit I
Brem 218 05-04-2015    Nobis Engineering presentation at 5/4/15 meeting
Brem 219 05-13-2015    Applicant's response to Nobis Engineering Report of 5/1/15

Brem 220 05-14-2015    GeoHydroCycle, Inc. review of NGI's report dated 5/4/15
Brem 221 05-15-2015    Nitsch Engineering memo on nitrogen calculation
Brem 222 05-18-2015    DEP response to Town Counsel request for water supply classification
Brem 223 05-19-2015    Attorney Deschenes letter to ZBA about peer review fees
Brem 224 05-20-2015    Technical Memorandum as an Addendum to Nobis' Phase 2 report (2.1mb)
Brem 225 05-29-2015    Impervious surface map
Brem 226 05-29-2015    Letter of concern to the State from David Ringheiser, an abutter
Brem 227 05-29-2015    E-Mail frm Marty Galligan with 2-page Nitrogen equivalency calculation
Brem 228 05-29-2015    Unit layout change
Brem 229 05-29-2015    Detailed grading & utility plan (color)

Brem 230 05-29-2015    Landscape plan
Brem 231 05-29-2015    Layout/Dimension plan
Brem 232 05-29-2015    Detailed grading & utility plan
Brem 233 05-29-2015    Artform Home Plans - Calinda
Brem 234 05-29-2015    Artform Home Plans - Brandywine Gold
Brem 235 05-29-2015    Artform Home Plans - Brandywine Classic
Brem 236 05-29-2015    Letter to the ZBA from the Applicant regarding new plans
Brem 237 06-01-2015    Summary of Requested Waivers
Brem 238 06-05-2015    Town Advisory Group letter to ZBA s
Brem 239 06-05-2015    Attachment to TAG letter - Coventry Decision

Brem 240 06-05-2015    Attachment to TAG letter - Rockpoint Decision  
Brem 241 06-05-2015    Applicant's letter to ZBA 
Brem 242 06-05-2015    Goldenrod architect plan attachment Brem_241
Brem 243 06-05-2015    Building specification attachment to Brem_241  
Brem 244 06-05-2015    Unit style  & Bedroom tabulation attachment to Brem_241
Brem 245 06-08-2015    ConsCom conditions recommendations to the ZBA
Brem 246 06-09-2015    Revised ConsCom conditions recommendations
Brem 247 06-08-2015    Preliminary Conditions List
Brem 248 06-09-2015    Aggregation of Flows and Nitrogen Loading by Nitsch Eng
Brem 249 06-08-2015    Applicant's submittal letter to ZBA

Brem 250 06-08-2015    Birches Pro-forma 13 units with equiv calcs
Brem 251 06-08-2015    Birches Pro-forma 13 units
Brem 252 06-08-2015    Birches Pro-forma 16 units
Brem 253 06-09-2015    Revised Birches Pro-forma 17 units
Brem 254 06-09-2015    Revised Birches Pro-forma 18 units
Brem 255 06-09-2015    Revised Birches Pro-forma 19 units
Brem 256 06-09-2015    Revised Birches Pro-forma 20 units
Brem 257 06-08-2015    Uneconomic analysis, well setback waiver, Exhibit D
Brem 258 06-08-2015    Uneconomic analysis, well setback 165 GPD, Exhibit E
Brem 259 06-08-2015    Birches Pro-forma 4 units

Brem 260 06-10-2015    Letter to ZBA regarding 110 standard from an abutter
Brem 261 06-12-2015    Applicant's comments on the draft conditions
Brem 262 06-12-2015    BOH response to waiver requests
Brem 263 06-15-2015    Planning Board Recommendations on Requested Waivers
Brem 264 06-15-2015    Nitsch Engineering memo regarding Septic Flow
Brem 265 06-08-2015    Birches Pro-forma 17 units
Brem 266 06-08-2015    Birches Pro-forma 18 units
Brem 267 06-08-2015    Birches Pro-forma 19 units
Brem 268 06-08-2015    Birches Pro-forma 20 units
Brem 269 06-19-2015    Extension Request from Attorney Doug Deschenes

Brem 270 06-18-2015    Planning Board decision on special permit for Garrison Place
Brem 271 06-18-2015    Operation and Management Plan for Garrison Place
Brem 272 06-22-2015    Definitive Subdivision Approval by Planning Board for Hart Farm Estates
Brem 273 06-26-2015    Letter of concern to the ZBA from David Ringheiser, Carlisle resident
Brem 274 06-24-2015    Revised Detailed Grading and Utility Plan
Brem 275 06-26-2015    Revised Layout/Dimension Plan
Brem 276 06-26-2015    Revised Detailed Granding and Utility Plan
Brem 277 06-26-2015    Revised Plan and Profile & Utility Plan
Brem 278 06-26-2015    BOH condition regarding escrow accounts
Brem 279 06-25-2015    Input from abutters and neighbors to conditions and condo docs

Brem 280 06-24-2015    Well data and central tendency statistics for project, PDF Summary
Brem 281 06-24-2015    Well data and central tendency statistics for project, XLS file
Brem 282 06-24-2015    Cover letter from Member Hinton to statistics for project
Brem 283 06-23-2015    Link to video regarding water on Cape Cod (updated)
Brem 284 06-29-2015    Letter of concern from Susan Blankenship, an abutter
Brem 285 06-29-2015    Covenant for Operations and Maintenance for Garrison Place
Brem 286 06-29-2015    Draft Conditions Concerning Condo documents
Brem 287 06-29-2015    Applicant's letter to ZBA regarding Consultant Review Fees
Brem 288 07-13-2015    Draft Decision - version 1
Brem 289 07-17-2015    Draft Decision - version 2

Brem 290 08-12-2015    Final decision for 100 Long Ridge Rd (17mb)
Brem 291 07-08-2016    Revised site plan dated 2/6/16
Brem 292 08-02-2016    ConsCom comments regarding revised site plan
Brem 293 08-03-2016    Planning Board's comments regarding revised Site Plan
Brem 294 08-05-2016    Applicant's Summary of The Birches Plan Changes
Brem 295 08-05-2016    Board of Health comments regarding revised site plan
Brem 296 08-08-2016    Letter of concern from abutter David Ringheiser
Brem 297 08-08-2016    NGI Wastewater & Water Supply Design Modification Impacts
Brem 298 08-11-2016    Summary of Planning Administrator's 8/8/16 comments 
Brem 299 08-13-2016    Fire Chief David Flannery's comments on the revised site plan

Brem 300 08-22-2016    Public Water Supply Utility Plan
Brem 301 08-22-2016    Stormwater Management Volume 2 HydroCAD
Brem 302 08-22-2016    Stormwater Management Volume 1
Brem 303 08-25-2016    Revised site plan for Fire Truck Turning Exhibi
Brem 304 08-25-2016    Applicant's letter explaining Plan P revision
Brem 305 08-23-2016    Attachment A to Brem_304, updated Nitro Equivalency Calculations
Brem 306 08-26-2016    Conservation Commission's revised comments
Brem 307 08-30-2016    Corrected tabulation of bedroom mix
Brem 308 09-09-2016    Additional comments from the Board of Health
Brem 309 09-09-2016    Attachment to Brem_308

Brem 310 09-30-2016    Figures for Nobis Phase 4
Brem 311 09-30-2016    Tables for Nobis Phase 4
Brem 312 09-30-2016    Nobis Phase 4 Report (11 mb)
Brem 313 09-30-2016    Attachments A,B,C for Nobis Phase 4
Brem 314 09-30-2016    Attachment D to Nobis Phase 4 report (draft)
Brem 315 10-03-2016    Letter from abutter Dave Ringheiser questioning Nobis report
Brem 316A 10-03-2016  Key Chapters from MassDep Guideline for PWS
Brem 316C 10-03-2016  Chapter 4 Groundwater Supply delivery
Brem 316D 10-03-2016  Chapter 2 General design considerations
Brem 317 10-03-2016    Nobis attachment D (final) to Phase 4 report
Brem 318 10-04-2016    Revised 2016 Nobis Phase 4 proposal
Brem 319 10-05-2016    Letter of concern from abutter Colin Higgins

Brem 320 10-12-2016    Letter of concern from abutter David Ringheiser
Brem 321 10-18-2016    Peer Review Report by Nitsch Eng
Brem 322 10-25-2016    Nobis Tech Memo on nitrate mass balance
Brem 323 10-26-2016    Applicant's response to Nitsch peer review report
Brem 324 11-28-2016    Guidelines for Title 5 Aggregation of Flows and Nitro Loading
Brem 325 12-01-2016    Letter of concern from abutter Mike Hanauer, 200 Long Ridge Rd
Brem 326 12-04-2016    Letter regarding fire safety from abutter Thornton Ash
Brem 327 12-05-2016    Comments regarding cistern requirements from Chief of the Fire Department
Brem 328 12-06-2016    Letter of concern regarding water quality from Dave Ringheiser
Brem 329 12-08-2016    Correspondence from abutter Dave Ringerheiser regarding protect abutters water

Brem 330 12-08-2016    Final Nobis Overburden Bedrock Tech Memo
Brem 331 12-15-2016    Revision of site plan with Fire Truck Turnaround
Brem 332 12-20-2016    Letter from Attorney Dan Hill regarding hydrologist study (5.9 mb)
Brem 333 12-24-2016    Letter of concern from abutter David Ringheiser
Brem 334 12-24-2016    BOH waivers report from the Applicant's hydrogeologist
Brem 335 01-04-2017    Nobis Engineering review of NGI report (Brem 334)
Brem 336 01-04-2017    NGI Additional Modeling Results
Brem 337 01-04-2017    Applicant's letter regarding funding for mechanism to replace wells outside of project
Brem 338 01-04-2017    Attny. Bobrowski's proposed edits to Conditions of Approval (11mb)
Brem 339 01-05-2017    Project dispersion model sensitivity analysis table

Brem 340 01-06-2017    Revised fire truck turnaround per NFPA
Brem 341 01-06-2017    Exhibit U potential 48,000 gallon cistern
Brem 342 01-10-2017    Letter from David Freedman regarding BOH waivers
Brem 343 01-16-2017    A letter of concern regarding water from abutter David Ringheiser
Brem 344 01-16-2017    Nobis response to statement in Brem_338
Brem 345 01-17-2017    Fire Chief comments on Turning Template & Cistern
Brem 346 01-17-2017    Nobis response to NGI 1/4/17 report (8 mb)
Brem 347 01-18-2017    Board of Health requested waivers
Brem 348 01-19-2017    NGI mixing zone dilution analysis
Brem 349 01-19-2017    NGI Comments on Nobis 1/3/17 report

Brem 350 01-19-2017    Letter from Planning Administrator regarding fire protection
Brem 351 01-19-2017    Letter from abutter Stephen Davis regarding Blue Baby Syndrome
Brem 352 01-19-2017    Letter from Lyn Lemaire regarding issues Board should consider

Brem 353 02-28-2017    Final 100 Long Ridge Rd Decision After Remand - (17mb)

Keys:
BREM - Brem Property, 100 Long Ridge Road
Note:  BREM 079 and 080 are essentially the same document; 079 contains a brief email and the 3-page letter, 080 contains the 3-page letter and a chart of wells within 100 feet

Last Updated: 01 Mar 2017 9:03 am EST




 
Site  This Folder
 
Advanced Search

Town Seal
Town of Carlisle 66 Westford Street, Carlisle, MA 01741

Phone: (978) 369-6155    Fax: (978) 371-0594    townhall@carlisle.mec.edu
  
Virtual Towns & Schools Website